Description: |
installation qualification check list (IQ), operation qualification (OQ) and performance qualification (PQ). Contains: -temperature correctness test of the device (1 measurement point in geometrical center of the chamber) at 3 temperatures selected by Laboratory from the whole temperature range of the device -spatial (homogeneity and fluctuation) temperature distribution in 9 or 10 measurement points at one, chosen by the User temperature in the empty and filled chamber (the chamber is filled in 60%). There is a possibility for further spatial temperature tests in more measurement points (additionally paid). Measurements are confirmed with the issue of Qualification Protocol. Measurement period: app. 2-3 days. Measurements are performed at POL-EKO Measurement Lab.
|